FAT Test
Factory Acceptance Test ensuring equipment performance and compliance before delivery
What is FAT?
Factory Acceptance Test (FAT) is a comprehensive testing procedure conducted at our facility before equipment shipment. It verifies that the equipment meets all design specifications and performance requirements.
Clients or their representatives are welcome to witness the FAT process, ensuring complete transparency and confidence in the delivered equipment.


Test Types
Comprehensive testing covering all aspects of equipment performance
Hydrostatic Test
Pressure test using water at 1.5x design pressure
Performance Test
Thermal and hydraulic performance verification
Temperature Test
Temperature distribution and approach verification
Functional Test
All mechanical and control functions verification
FAT Process
Systematic approach ensuring thorough testing at every stage
Pre-Test Preparation
Review of test procedures, calibration of instruments, and setup of test equipment.
Pressure Testing
Hydrostatic or pneumatic pressure testing to verify pressure boundary integrity.
Performance Testing
Thermal performance verification under simulated operating conditions.
Functional Testing
Verification of all functional components and control systems.
Documentation Review
Final review of all test records and documentation.
Acceptance Criteria
Clear standards ensuring consistent quality
FAT in Action
Real scenes from our Factory Acceptance Test process


Air cooler structure assembly inside factory with scissor lifts


Wide view of air cooler structure inside factory


Technicians performing FAT on air cooler fan assembly


Large air cooler structural frame lifting


Steel frame structure assembly


Air cooler unit assembly with crane


Large air cooler structure with walkway and railings
FAT Video
Watch our Factory Acceptance Test process in action
Video 1
Video 2
Video 3